Network Statement 2019
The Network Statement can be considered as Banedanmark's product catalogue and presents the conditions for access to the infrastructure managed by Banedanmark.
The Network Statement contains, among other things
- Conditions for access to Banedanmark's infrastructure
- Description of the infrastructure
- Description of the capacity allocation process
- Description of Banedanmark's services and charges for the use of the infrastructure
The Network Statement has been prepared on the basis of current legislation and associated administrative regulations, including Executive Order No. 1245 of 10/11/2015 on the allocation of railway infrastructure capacity (train paths) etc., which in particular transposes Article 27 of Directive 2012/34 / EU and Annex IV of the Directive.
2_3A Standard Access Contract | |
---|---|
2_3B Standard Access Contract for Oresundsbro Consortiums infrastructure | |
2_3C Access Agreement for the purchase and reservation of infrastructure capacity | |
2_5 Current loading gauges in Denmark | |
3_1A Railway lines in Denmark | |
3_1B Lines open for passenger traffic | |
3_1C Lines open for freight traffic | |
3_2A Active and inactive sidings | |
3_2B Borders to other Infrastructure Managers | |
3_2C Bordering to other Infrastructure Managers and private tracks | |
3_2D Midtjyske Jernbaner | |
3_2E Lokaltog Region H | |
3_2F Nordjyske Jernbaner | |
3_2G Lokaltog Region S | |
3_2H Vestbanen | |
3_2I DSB tracks managed by Rail Net Denmark | |
3_3A Number of tracks in open lines | |
3_3 B Route numbers | |
3_3C Reference line for rolling stock | |
3_3D Guideline overview of maximum axle load | |
3_3E Guideline overview of maximum meter load | |
3_3F Maximum line speeds | |
3_3G Electrified routes | |
3_3H Control centres and coverage areas | |
3_3I Train control systems | |
3_5A Infrastructure works and other limitations to capacity | |
3_6A Heights and lengths of platforms in stations | |
3_6B Heights and lengths of platforms in stations ECTS | |
3_7 DSB facilities | |
3_8 Sidings | |
3_8A Electrified sidings | |
3_9A Signalling Programme _ Roll out plan for main and regional lines | |
3_9B Signalling Programme _ Roll out plan for s_train lines | |
4_3 Timetable for capacity allocation | |
4_4 Capacity usage | |
5 Minor TCR | |
6_6 Length of lines for calculation of infrastructure charges |